Live Wire
POET $5.07 Delayed ◆ Guidance 30,000 optical engine shipment target for 2026◆ Orders $5M+ production order from unnamed systems integrator (Oct 2025)◆ Malaysia Globetronics facility operational · NationGate engaged◆ Lumilens $50M framework · samples expected late 2026◆ Earnings Q3 2026 results reported Nov 16 · revenue $1.03M, up 244% · scorecard graded · next: Q4/FY2026 results Mar 1, 2027◆
POET NASDAQ $5.07 Delayed
UPDATED NOV 16, 2026 | Q3 2026 scorecard graded against the Nov 16 print; dashboard, key figures and 2030 Scenarios updated to Q3 figures. View Changes → RSS feed — milestone updates ↗
/partnerships — disputed claims

Disputed Claims

Every partnership claim this dossier grades as disputed, gathered in one place with the context a bare grade leaves out: the claim as announced, the challenge to it, the source on each side, and where the grade stands now. Nothing here is newly labeled — the grades are carried over unchanged from the Partnership Showcase, the Partnership Timeline, Commercial Reality and the Partnership Graph, and no claim appears here that those sections do not already mark.

LITEON

Strategic collaboration — AI optical modules & CPO
Disputed
The claim
POET and LITEON Technology are collaborating to co-develop AI optical modules and co-packaged optics. Announced March 16, 2026 via Form 6-K, with LITEON executive Sander Su quoted; prototypes targeted for late 2026, production in 2027.
The dispute
Night Market Research (May 2026, disclosed short) claims the partnership is hollow, and reports that LITEON's president stated “LITEON doesn't cooperate with this company” — a claim in direct conflict with the securities filing.
Sources
Status now
Disputed, unresolved. Announced on the record, but not yet confirmed by output from either side; the underlying agreement has not been formally terminated.

Graded in: Showcase card · Timeline · Commercial Reality · Partnership Graph

Foxconn / FIT

Design win — 800G / 1.6T pluggable transceiver modules
Disputed
The claim
Foxconn Interconnect Technology (FIT) won a design win and collaboration to build 800G and 1.6T pluggable transceiver modules on POET optical engines for high-speed AI systems. Announced May 14, 2024, with a quote from FIT CTO Joseph Wang.
The dispute
Night Market Research (May 2026) claims a Foxconn executive said Foxconn “stopped using POET two years ago.” The dossier records no primary-source rebuttal from POET — beyond the original 2024 announcement, the company side of this dispute is not stated in any primary source the dossier found.
Status now
Disputed, unresolved in any primary source — graded disputed, not ended. There is no company confirmation of volume orders, and the underlying agreement has not been formally terminated.

Graded in: Showcase card · Timeline · Commercial Reality · Partnership Graph

LuxshareTech

Module partner — 400G / 800G engines
Disputed
The claim
LuxshareTech is a module partner for POET's 400G/800G engines (2023), expanded August 2024 to 800G 2xFR4 OSFP modules in DSP and LPO variants. LuxshareTech showed 400G/800G modules at OFC 2025 in POET's own release.
The dispute
Night Market claims two Luxshare executives at OFC 2026 had “never heard of POET.”
Status now
Disputed. The two accounts are unreconciled in any primary source found. Note: LuxshareTech is not one of the Showcase's 13 cards — its Disputed grade is the one carried in the Partnership Graph.

Graded in: Partnership Graph · dispute also noted in Notable Quotes

Scope: this sidebar is a gathering point, not a new grade. It covers exactly the claims the dossier already marks Disputed — nothing graded Active, False, Ended or Unverified appears here; those verdicts stay in Commercial Reality and the Partnership Showcase. Grades change when the record does, in the sections that carry them first.

/commercial-reality

Commercial Reality

Claims circulating on social media and investor forums, set directly against the filed record. Each row is graded — and each row has its own anchor, so a verdict can be dropped straight into the thread where the claim is spreading.

Link

>1M/yr is a projected capacity target at full Malaysia build-out — not current output. Q2 2026 revenue was $569,925: a record quarter, and nowhere near a million-engine run-rate. No volume shipments have been reported in any filing.

Source: Q2 2026 earnings release

Link

Marvell cancelled all POET purchase orders on April 23, 2026, citing a confidentiality breach by POET's CFO. POET disclosed the cancellation on April 27, 2026; the stock fell 47.4%.

Source: Company disclosure, Apr 27, 2026

Link

Night Market Research (May 2026, disclosed short) claims the partnership is hollow. The collaboration was announced March 16, 2026 with prototypes targeted for late 2026 — announced on the record, but not yet confirmed by output from either side.

Source: Night Market Research report, May 2026

Link

The same short-seller report disputes the FIT tie. POET announced a design win in May 2024, but there is no company confirmation of volume orders, and the current status is unresolved in any primary source.

Source: Night Market Research report, May 2026

Link

No company disclosure or filing supports purchase orders from any hyperscaler. Those names appear in the Partnership Graph as context nodes with no documented tie — demand reaches POET, if at all, through module makers.

Source: None — absent from all filings

How verdicts are graded: False — contradicted by a filing or company disclosure. Disputed — announced by POET but challenged by named short-seller research, with no primary-source resolution either way. Unverified — no supporting document exists in the public record at all. Verdicts change when the record does; the partnership grades behind several of these rows are in the Partnership Showcase above.

/commercial-reality — rumor & speculation disclosure

Rumor & Speculation Disclosure

Some claims around POET circulate with no document behind them — guidance repeated as results, signals read as proof, names attached without a source. This box gathers every item this dossier itself already grades unverified, unconfirmed or speculation, labels it as such, and states what would verify it — so rumors are labeled, not amplified. Nothing here is newly labeled, and nothing here is presented as fact.

HOW TO READ THIS BOX An item stays in this box until the check named in its “What would verify it” row appears on the record. Claims the dossier grades False stay in Commercial Reality above; ties it grades Disputed are gathered in the Disputed Claims sidebar; figures it verifies are traced in the Figure Provenance Registry. An expected milestone that has simply not been disclosed yet is not speculation, and is not listed here.

“POET has purchase orders from Nvidia / Broadcom / AWS”

UNVERIFIED
Where it stands
Graded UNVERIFIED in Commercial Reality: “No company disclosure or filing supports purchase orders from any hyperscaler.” Those names appear in the Partnership Graph as context nodes with no documented tie — demand reaches POET, if at all, through module makers.
What would verify it
A company disclosure or filing supporting purchase orders from a hyperscaler. Today the source line for this claim reads: “None — absent from all filings.”

Graded in: Commercial Reality · Partnership Graph

The 30,000-engine 2026 shipment target

GRADED — MOVED TO Q2 2027
Where it stands
Company guidance — “We expect to ship more than 30,000 optical engines this year” — graded Nov 16, 2026: not met in 2026. The Q3 release moved shipment of the backlog, including the 30,000 engines, to Q2 2027; no shipments disclosed against it, and verified output stands at “None disclosed.” Guidance, not a result.
What would verify it
Shipments reported in a filing. The November 16 Q3 report was the first scheduled disclosure that could confirm progress — it disclosed no shipment count and moved the target to Q2 2027.

Graded in: Production Tracker · Key Figures · Provenance Registry

Lessengers 1.6T samples, targeted for Q2 2026

UNCONFIRMED
Where it stands
With the 30,000-engine target, one of “the two nearest-term markers unconfirmed as of October 5” — “Neither has been confirmed as met in a filing,” despite the company’s August 13 statement that it would make additional announcements and updates in September.
What would verify it
Evidence in the Q3 results: “Q3 results on November 16 are the natural place for that evidence: the first scheduled disclosure in which reported shipments and revenue can confirm what September’s announcements did not.”

Graded in: Latest Coverage — Merlin Trader review

Penang partner hiring as a mass-production signal

SPECULATION
Where it stands
Retail investors — via Moomoo, cited by ad-hoc-news.de in August 2026 — point to aggressive hiring at Globetronics and NationGate as a potential mass-production signal. The Hiring Pipeline grades it SPECULATION — NOT CONFIRMED: “This is not company-confirmed,” POET has not linked partner headcount to POET order volume, and partner hiring can serve other customers entirely.
What would verify it
The reported numbers: “If Penang output is ramping, Q3/Q4 numbers will show it before a job board does — that is where this signal gets checked.” Until then it counts only as a signal that might later corroborate a filing.

Graded in: Hiring Pipeline

A POET–MACOM business tie

UNVERIFIED
Where it stands
The Partnership Graph carries MACOM as “D3 · UNVERIFIED”: “The sole connection is personnel: a POET executive (Vivek Rajgarhia) previously worked at MACOM. Employment history is not a business tie, and none is drawn.” The Scenarios revenue build weights MACOM at $0 in all cases.
What would verify it
A primary source. The Scenarios model carries MACOM at “$0 until a primary source exists.”

Graded in: Partnership Graph · 2030 Scenarios

POET light sources reaching Nvidia racks inside FIT modules

SPECULATION
Where it stands
The Graph draws this as a dotted edge labeled “Speculation — not documented”: “The only POET–Nvidia link is March 2026 Seeking Alpha speculation that POET light sources might reach Nvidia racks inside FIT modules.” Nvidia’s documented photonics ties run to Ayar Labs and TSMC COUPE.
What would verify it
A document. The Graph’s honesty rule: “an edge appears only where research found a document.” Until research finds one, the edge stays dotted and speculated.

Graded in: Partnership Graph

The name of POET’s consigned-equipment vendor

UNVERIFIED
Where it stands
POET purchased wafer-level process equipment and consigned it to Globetronics in Penang, where it is being installed. The Tooling Tracker records: “Equipment vendor: not disclosed in company announcements — any vendor name in circulation is unverified.”
What would verify it
Disclosure in a company announcement. Until a company announcement names the vendor, any name in circulation stays unverified.

Graded in: Wafer Journey — Tooling Tracker

“Lowest coupling loss”

UNVERIFIABLE
Where it stands
POET claims “lowest coupling loss” without publishing a number; the Architecture matrix lists its insertion loss as “Not disclosed,” and the matrix and the Glossary both grade the claim unverifiable without a number. Ayar Labs is the only platform in the matrix with a published figure (0.35 dB, for its fiber connector).
What would verify it
A published number. The matrix names where the missing figures “would have to appear”: “Q3 disclosures and demo data.”

Graded in: Architecture · Glossary — Insertion Loss

The Semtech collaboration’s commercial weight

UNCONFIRMED
Where it stands
The 1.6T collaboration was highlighted at Semtech’s October 15, 2026 analyst day, but no POET orders were announced. The briefing grades it “a documented collaboration with unconfirmed commercial weight” — ecosystem validation, not revenue.
What would verify it
In the briefing’s own words: “a named joint product, a design win, or order language in a Semtech or POET disclosure.”

Graded in: Partnership Showcase · Latest Coverage — Semtech briefing

Revenue under the Lumilens $50M purchase order

UNCONFIRMED
Where it stands
The purchase order itself is confirmed — signed May 14, 2026, inside a framework conditional to >$500M over five years. What is unconfirmed is the revenue: “revenue recognized against it: none disclosed,” with engineering samples expected late 2026. The brief treats “the tie as documented but the revenue as unconfirmed.”
What would verify it
Shipments actually reported: the revenue stays unconfirmed “until shipments are actually reported.”

Graded in: Production Tracker · Key Figures · Latest Coverage — Lumilens briefing

The Lumilens framework’s end hyperscaler

UNNAMED
Where it stands
The Scenarios factor on partnerships states it plainly: Lumilens is “the only tier-1-adjacent revenue path and its ~$500M framework is conditional, end hyperscaler unnamed.” No name for the framework’s end customer appears anywhere in this dossier.
What would verify it
The Scenarios swing events name the check: “Lumilens names its hyperscaler” — or framework tranches convert to firm POs.

Graded in: 2030 Scenarios

“Sanan funded only ~$7M of its $25M JV commitment”

NOT CONFIRMED
Where it stands
A Night Market allegation about the SPX joint venture, which ended with POET’s December 31, 2024 buyout. The Graph grades it “not confirmed by primary sources (filings cite ~$5M received by June 2021).”
What would verify it
A primary source confirming the allegation. The filed record today cites ~$5M received by June 2021 — not the ~$7M figure in circulation.

Graded in: Partnership Graph

Lumilens preparing a future US listing

NOT VERIFIED
Where it stands
A Lumilens APAC Controllership Director posting (Singapore, observed October 2026) states the role covers “SOX readiness in support of a future US listing.” The Hiring Pipeline flags it as a potential IPO-preparation signal and grades the listing language “not independently verified — no listing filing, timetable, or exchange has been announced.” The language is Lumilens’s own, taken from the job posting.
What would verify it
A listing filing — the filing, timetable or exchange announcement the dossier notes has not been announced.

Graded in: Hiring Pipeline

Scope: this box is a gathering point, not a new grade. It covers exactly the items this dossier already marks Unverified, Unconfirmed or Speculation — nothing graded Active, Disputed, Ended or False is relabeled here, and no item here is upgraded by appearing in this box. Grades change when the record does, in the sections that carry them first.

← Back to Dashboard OPERATIONAL STANDARD · REV 2026.10

Production Verification Methodology

The evidentiary standard for tracking POET's transition from development to volume packaging.

01

Capacity Guidance vs. Realized Output

The standard enforces a strict boundary between installed machine capability and verified units out the door.

  • Forward Targets: Stated facility capacity (e.g., the CEO's projection of >1M optical engines/yr or 30,000 units across 2026) is indexed as a benchmark ceiling, never entered as production data.
  • Progress Bar Logic: Visual dials and progress meters reflect exclusively shipped, accepted, or revenue-recognized hardware.
02

Primary Verification Hierarchy

Data points are admitted only if backed by primary regulatory or verified supply chain records.

Tier 1 · Statutory

SEC Form 6-K, SEDAR quarterly filings, and audited revenue lines. These establish final volume baselines.

Tier 2 · Disclosed Orders

Formal press releases confirming firm purchase order execution (e.g., the initial $50M Lumilens PO) with specified delivery milestones.

Tier 3 · OSAT / Assembly

Confirmed production line tooling and line-rate reporting from packaging partners (Globetronics, NationGate in Penang; SPX in Xiamen).

03

Commercial Allocation & Unit Categorization

Optical engines are not fungible in financial analysis; each verified shipment is segmented by commercial status.

  • Commercial Shipments: Production engines shipped against non-cancellable POs, actively contributing to product revenue.
  • Joint Development / NRE Samples: Prototype and testing units delivered under co-development agreements (e.g., 1.6T 2xDR4 modules with Lessengers; LITEON joint optical engines). These are tracked as engineering validation, not production scale.
/provenance

Figure Provenance Registry

Every key figure in this dossier, traced to the document it came from: the value as stated, the source document, and the figure's vintage — the period or date the figure belongs to. If a figure is disputed, this is the record to check it against: find the row, open the source document, and compare.

Extraction date & reviewer

The dossier records a source document and a vintage for each figure below, but it does not record when a figure was extracted from its document, or who reviewed it. Those two columns therefore read Not recorded on every row — the gap is shown, not filled in.

Find a figure

Figure classes: Reported (filed results and company-disclosed amounts) · Guidance (company forecast or target) · Consensus (analyst estimates, provider named) · Site estimate (dossier arithmetic from filed figures) · Community (third-party figure as presented, chain stated). One row is flagged Unclassified — no source named until a source document is named for it.

Figure Provenance Registry — value, class, source document and vintage per figure
Figure ValueClass Source document Vintage Extraction date Reviewer In this dossier
Filed financials — Q2 2026 statements
Cash and cash equivalents$432,531,904ReportedCondensed Interim Consolidated Financial Statements — Statements of Financial Position, furnished with the Form 6-K filed August 13, 2026At June 30, 2026 · Q2 2026Not recordedNot recordedWaterfall →
Short-term investments$363,809,999ReportedCondensed Interim Consolidated Financial Statements — Statements of Financial Position, furnished with the Form 6-K filed August 13, 2026At June 30, 2026 · Q2 2026Not recordedNot recordedWaterfall →
Cash + short-term investmentsThe quarter-end total as reported in the Q2 2026 release: “quarter-end cash and short-term investments of $796.3 million.”$796,341,903$796.3M as reportedReportedCondensed Interim Consolidated Financial Statements (Form 6-K filed August 13, 2026); also “POET Technologies Reports Second Quarter 2026 Results,” GlobeNewswire, August 13, 2026 (Exhibit 99.1 to the Form 6-K)At June 30, 2026 · Q2 2026Not recordedNot recordedWaterfall →
Revenue — Q2 2026Sixth consecutive quarter of sequential revenue growth, as filed.$569,925ReportedQ2 2026 results, as filed — “POET Technologies Reports Second Quarter 2026 Results,” GlobeNewswire, August 13, 2026 (Exhibit 99.1 to the Form 6-K filed August 13, 2026)Q2 2026Not recordedNot recordedProduction →
Net cash used in operating activities$21,079,966ReportedCondensed Interim Consolidated Financial Statements — Statements of Cash Flows, furnished with the Form 6-K filed August 13, 2026Six months ended June 30, 2026 · H1 2026Not recordedNot recordedWaterfall →
Net cash used in operating activities — prior-year comparative$16,718,536ReportedCondensed Interim Consolidated Financial Statements — Statements of Cash Flows (comparative column), furnished with the Form 6-K filed August 13, 2026Six months ended June 30, 2025 · H1 2025Not recordedNot recordedWaterfall →
Research and development expenseQ2 2026 alone: $6,993,258. An accrual-basis line inside operating results — not an additional deduction on top of cash burn.$12,833,592ReportedCondensed Interim Consolidated Financial Statements — Statements of Operations, furnished with the Form 6-K filed August 13, 2026Six months ended June 30, 2026 · H1 2026Not recordedNot recordedWaterfall →
Purchases of property and equipmentActual equipment purchases — the baseline the ~$50M H2 2026 plan is a step-up of roughly 9× from.$5,444,848ReportedCondensed Interim Consolidated Financial Statements — Statements of Cash Flows, furnished with the Form 6-K filed August 13, 2026Six months ended June 30, 2026 · H1 2026Not recordedNot recordedWaterfall →
Production, orders & guidance
2026 optical-engine shipment targetCompany guidance — “We expect to ship more than 30,000 optical engines this year.” Graded UNCONFIRMED: no shipments disclosed against it.30,000 enginesGuidanceCEO Dr. Suresh Venkatesan, Q4 2025 earnings statement, March 31, 2026 — Q4 2025 earnings ↗Calendar 2026 · guidanceNot recordedNot recordedProduction →
Verified shipped outputNo volume engine shipments have been reported in any filing to date — Tier 1 & 2 verified only.None disclosedReportedThe filed record as tracked in the Production Tracker — no filing reports volume shipmentsAs of the Q3 print, November 16, 2026Not recordedNot recordedProduction →
Projected Malaysia capacityGlobetronics + NationGate nameplate target at full build-out. A capacity plan — not output.>1,000,000 / yrGuidanceCompany projection as stated in the Production Tracker (Capacity vs. Output)Full build-out · projectedNot recordedNot recordedProduction →
Lumilens initial purchase orderPurchase order confirmed; revenue recognized against it: none disclosed. Engineering samples expected late 2026.$50MReported (filed)Form 6-K, May 14, 2026 — Form 6-K via StockTitan, May 14, 2026 ↗Signed May 14, 2026Not recordedNot recordedPartnerships →
Lumilens framework ceilingConditional, in POET's own words, on development, qualification and manufacturing scale-up.>$500M over 5 yearsReported (filed)Form 6-K, May 14, 2026 — Form 6-K via StockTitan, May 14, 2026 ↗Five-year framework from May 14, 2026 · conditionalNot recordedNot recordedPartnerships →
Planned capital equipment deploymentCompany-stated plan — not spent, not a filed commitment. Labeled GUIDANCE in the Waterfall.~$50,000,000Guidance“POET Technologies Recaps Highlights of CEO's Update on Commercial Activities and Provides Results of 2026 AGM,” GlobeNewswire, June 30, 2026 (Exhibit 99.1 to Form 6-K); AGM held June 26, 2026Second half of 2026 · guidanceNot recordedNot recordedWaterfall →
Share-price fall on the Marvell cancellation disclosureMarvell cancelled all POET purchase orders on April 23, 2026; POET disclosed the cancellation on April 27, 2026.−47.4%ReportedCompany disclosure, April 27, 2026 — Form 6-K via StockTitan, Apr 27, 2026 ↗April 27, 2026Not recordedNot recordedCommercial Reality →
Financing, people & market snapshot
Capital raiseThe raise funds the production ramp; it is roughly 50% of the $796.3M cash position.US$400MReported“POET Technologies Announces Closing of US$400 Million Investment,” GlobeNewswire, May 18, 2026 — $400M financing announcement ↗Completed May 2026Not recordedNot recordedProduction →
Global headcountCompany FAQ snapshot: ~115 at the end of June 2026, “increasing fast”; roughly 50 additional hires planned (~165 planned roles).115+ employeesReportedMay 2026 coverage of the $400M raise close — InforCapital, May 2026 ↗; POET FAQ, July 14, 2026 ↗May–July 2026 snapshot · ~115 at end of June 2026Not recordedNot recordedHiring →
Share price — dossier snapshotThe dossier labels this figure “Close Nov 6, 2026” and names no source document for it.$5.07Unclassified — no source named (flagged)No source document named in the dossierClose, November 6, 2026Not recordedNot recordedDashboard →
Q3 2026 consensus revenue estimateAnalyst estimates only — not company guidance. POET has issued no Q3 guidance of its own.$1.60MRange $0.70M–$2.50MConsensusZacks Investment Research consensus estimates for Q3 2026 (2 analysts)Q3 2026 estimate · ahead of the November 16, 2026 reportNot recordedNot recordedQ3 Watchlist →
Q3 2026 consensus EPS estimateAnalyst estimates only — not company guidance.−$0.07ConsensusZacks Investment Research consensus estimates for Q3 2026 (2 analysts)Q3 2026 estimate · ahead of the November 16, 2026 reportNot recordedNot recordedQ3 Watchlist →
AGM market data — company-presented
Global laser marketCompany-presented market data — third-party figures as selected and framed by POET in its own deck, not independently verified.$20B+ → $30B+CommunityPOET 2026 AGM deck (“POET 2026AGM v8_kb”), slide 17, citing LightCounting, Optics for AI (Jan 2026)2024, projected 2030 · AGM held June 26, 2026Not recordedNot recordedArchitecture →
Forecast growth in InP optical lane demandCompany-presented market data, as above.~85% CAGRCommunityPOET 2026 AGM deck (“POET 2026AGM v8_kb”), slide 17, citing LightCounting, Optics for AI (Jan 2026)CY26–CY30 forecast · AGM held June 26, 2026Not recordedNot recordedArchitecture →
Market share held by the top 3 laser suppliersPer the deck, all three are sold out. Company-presented market data, as above.68%CommunityPOET 2026 AGM deck (“POET 2026AGM v8_kb”), slide 17, citing LightCounting, Optics for AI (Jan 2026)As presented at the AGM, June 26, 2026Not recordedNot recordedArchitecture →
Nvidia's investment in each of Lumentum and CoherentMade, per the deck, to lock in supply. Company-presented market data, as above.$2B × 2CommunityPOET 2026 AGM deck (“POET 2026AGM v8_kb”), slide 17, citing LightCounting, Optics for AI (Jan 2026)As presented at the AGM, June 26, 2026Not recordedNot recordedArchitecture →
Derived arithmetic — computed from filed figures, not reported figures
Runway on cash + short-term investments$796,341,903 ÷ $21,079,966 per half-year = 37.8 half-years ≈ 75.6 quarters. Assumes the H1 2026 burn rate stays constant — a snapshot calculation, not a forecast and not company guidance.≈ 18.9 yearsSite estimateArithmetic on the filed figures above — Waterfall, /runwayAt the H1 2026 filed burn rateNot recordedNot recordedWaterfall →
Runway on cash and cash equivalents alone$432,531,904 ÷ $21,079,966 per half-year = 20.5 half-years ≈ 41.0 quarters. Same constant-burn assumption as above.≈ 10.3 yearsSite estimateArithmetic on the filed figures above — Waterfall, /runwayAt the H1 2026 filed burn rateNot recordedNot recordedWaterfall →
Residual after guided capex and one half-year of burnIllustrative residual — after the guided ~$50M H2 2026 capex and one half-year of operating burn at the H1 2026 filed rate. Not a reported figure.$725,261,937$725.3MSite estimateIllustrative step computed in the Waterfall from the filed figures and the AGM capex guidance aboveH2 2026 illustrationNot recordedNot recordedWaterfall →

Scope: this registry covers the dossier's sourced figures — filed, guided, company-stated, and third-party figures as cited in the dossier — plus the arithmetic derived from the filed figures, labeled as such. The 2030 Scenarios section's model outputs and weights are not re-entered here; they stand as published in 2030 Scenarios. Partnership dates and statuses are traced in the Partnership Timeline. The headline figures in this registry are also summarized in the Key Figures at a Glance panel.